Latest news:

April, 2006: I am among 15 prominent young architects exhibiting their designs at The Eight Belgrade Triennial of World Architecture - Belgrade Fair from June 15th to 1st july 2006. NIS Refinerys Office building and Nessco Mixed Use buildings I designed will be represented at The Eight Belgrade Triennial of World Architecture - Belgrade Fair from June 15th to 1st july 2006.

READ MORE...

Quick Links:

NIS Belgrade

ampacomp

Novosadska Bank

knjaz milos

metalac

rad commerce

 

More info on my involvement in office projects:

Responsible for appraising and compiling the client’s brief, Concept Design (competition winning standard), schematic design, detail design, tender documents, specifications and site follow up;

Lead the project team and their own design team proactively and to coordinate with structural engineers, building services engineers, infrastructure and other sub consultants and specialists;

Coordinate with and supervise own team of Architects and Architectural technician on a day-to-day basis to achieve excellent design quality and documentation;

 

 

 

Ampacomp office building

 

Ampacomp office building in New Belgrade, Serbia. Pre design of the building represented to the client in January 2006 and waiting submission for municipal approval.~ 10000m²

This was a specific design with which I blew the competition away as they submitted designs characterized by post-modern architectural style.

The site for this building is located near a major road that connects new and old parts of Belgrade, equipped with heavy infrastructure and capable of hosting such hi-tech building.

Center of the location is characterized with a new man made lake on top of which the building would be constructed. The foundation for the building lies on individually based reinforced concrete slabs that are placed on top of 12m long concrete pillars that have been hammered in to the ground. Because the structure of soil in this part of Belgrade is characterized by underground water and sand, special foundation is needed.

From each concrete pillar there are steel tubes positioned at 45° angles that receive the load from the building above.

The building is divided by two separate wings that are connected in the middle at the ground floor by a central hall. Around this central hall there are restaurants, kitchen area with supplies and small exhibition areas. The floor in the public area of the ground floor is made of layered glass panels that are reinforced by two layers of PVC foils. Bellow this glass floor is a artificial lake and you have that '' Walking on the water" effect. 

Both wings consist of offices combining open plan and closed plan types.   

The facade of the building consists of Alubond panels and structural glazed aluminum panels with sun louvers.

The whole building is planed to be airconditioned.